Skip to content

Using managed charging to mitigate EV peak load

EV-EVSE-Mercury architecture

The rapid adoption of EVs has the potential to create both challenges and opportunities for utilities. An EV with a daily commuting distance of 25 miles requires as little as 7 to as much as 18 kWh of electricity to recharge each day. Unlike the infrastructure that has evolved to refuel vehicles with internal combustion engines, which relies on commercial gas stations, it is likely that the majority of EV charging will take place at home, where many consumers will install a Level 2 EV charging system that consumes 7 kW when charging. While this represents a significant energy sales opportunity for utilities serving those customers, it also poses formidable capacity and at-scale stability risks to the grid.

Use the form on the right to download “Using managed charging to mitigate EV peak load.”

EV-EVSE-Mercury architecture

Download the resource

Related Posts

Commercial and industrial fact sheet
Fact Sheet

February 1, 2023 | EnergyHub Team

Commercial and industrial fact sheet

READ MORE
Load shift with EnergyHub’s Mercury DERMS
Fact Sheet

February 1, 2023 | EnergyHub Team

Load shift with EnergyHub’s Mercury DERMS

READ MORE
A vision for the ADMS-DERMS relationship: Extending grid-edge situational awareness and control
Whitepaper

February 1, 2023 | EnergyHub Team

A vision for the ADMS-DERMS relationship: Extending grid-edge situational awareness and control

READ MORE

Interested in keeping up with the latest dispatch from the grid edge?

Get our next post in your inbox.

Reach out to us

We empower utilities to harness flexibility at the grid edge to meet their immediate needs and long-term strategic goals. Talk to an EnergyHub expert about your DER needs.